Friday, April 29, 2011

hovering exposed concrete auditorium within university hall

I wouldnt say that the formwork was extreme, but i am sure the engineering must have been quite tricky. The auditorium was built inside an already existing structure, with little space to move. The result is very pleasing, especially since the concrete surface came out very well (also in the rest of the building.

Auditorium at the physics lab of University of Greifswald (Germany):
image: BSB Bau Malchin

image: BSB Bau Malchin

image: BSB Bau Malchin

image: CEMEX

image: CEMEX

image: CEMEX


The auditorium fits 80 students.

more info here:
http://www.beton.org/sixcms/detail.php?id=43060


they used new plywood formwork, so no repairs there yet.

http://www.emplica.com

No comments:

Post a Comment